Synergy flat pack - progress update

For all who have expressed interest

If you have not heard back from me, please try contacting me again. I have replied to all enquiries (unless I have missed any by mistake). I've just had one email bounce back.

Celestion midranges

The order has been placed.

Cost

To be confirmed, as there are a few things still being determined that may affect the price. Better quality ply will be used, and this costs more than what was originally intended.

Plans

At this stage plans won't be provided.

Progress on the design

Still finalising the 3D form with all the details sorted for CNC. This part is quite detailed, and it will be more elaborate than S2. It's quite a bit of work to get it to the stage that it can all fit together for quick assembly. I'm aiming for a flat pack that can be assembled in a day.

What is coming

I will be getting one assembled and tested before taking deposits. This means you can see what you are getting, at least on the blog, before putting money down.

At that point I will revise the price with the final CNC quote and show the results. Then we can roll them out.


 